WES_Drainage_DiamondCourt

WES Drainage System – Clackamas County

Contract Amount $575,771 Diamond Court New stormwater pipe New stormwater treatment manhole Removal of downed trees and vegetation New maintenance access road William Otty Road Removal and replacement of an existing storm drain Add additional storm drain Removal and replacement of storm pipe and catch basin in William Otty Rd. Add maintenance access Sunny Way …

Read more

Last_Road_Improvements

SE Last Road Street Public Improvements

Clackamas County Contract Amount $442,630 Braun Construction was hired by Clackamas County to provide the following services on SE Last Road Street: road improvements, grading, storm water improvements, new sidewalk, curb and gutter, irrigation, striping and new asphalt paving.

Charbonneau_Utility_Repair

Charbonneau High Priority Utility Repair – City of Wilsonville

Contract Amount $921.783   Charbonneau HP Utility Repair – City of Wilsonville All labor, equipment and materials for the open trench replacement of 2500 lineal feet of storm pipe, between 10″ and 18″ diameter, cure in place installation of approximately 1500 lineal feet of storm pipe between 12″ and 18″ diameter, replacement and restoration of …

Read more

SE_Harney_Street_WCF

Harney Street Water Quality Facility

City of Portland Contract Amount $34,116 Harney Street water quality project adjacent to Johnson Creek. This project constructed a water detention area that will collect runoff from surrounding neighborhoods, helping to clean the water and remove sediment before the water is discharged in to Johnson Creek, regrading Harney Street so that it sheds water away from …

Read more

Chumbly_Cottonwood_2018

2018 Chumbley and Cottonwood Wildlife Mitigation Sites

US Army Corps of Engineers – Portland District Contract Amount $504,789 Braun Construction was hired by the US Army Corps of Engineers to maintain existing riparian plantings at Chumbley (75 acres) and Cottonwood Island (100 acres) wildlife mitigation sites in Cowlitz County, WA.  This consisted of: Mowing and weed whacking Herbicide application Manual removal of …

Read more

Dickenson_Park_Stream_Restore

Dickinson Park Stream Enhancement

City of Portland Contract Amount $30,358   Braun Construction removed a pipe, pump house, footbridge, and other structures to restore 68 feet of stream to create wetland and floodplain habitat next to the stream channel.  This will help to control flooding, recharge groundwater, trap sediments and pollution, recycle nutrients, and provide habitat. Summer flows from …

Read more

Corps_US_Moorings_Paving

US Moorings Warehouse Paving

US Army Corps of Engineers Contract Amount $76,999 Concrete pavement repair.  Asphalt paving.  Evacuation driveway and drain line repair.

Albert_Kelly_Stream_Daylighting

Albert Kelly Stream Daylighting

City of Portland Contract Amount $150,000 City of Portland – Albert Kelly Stream Daylighting Storm pipe removal. Construction of stream channel and riparian buffer.  Install new stream bed and habitat Construction of new stream channel  

Division_Orcutt_Sherwood

Sewer & Pavement Rehab – City of Sherwood

City of Sherwood Contract Amount $587.963 City of Sherwood – Division Street and Orcutt Place Storm Sewer and Pavement Rehab   Installation of storm sewer, asphalt removal, cement treating of base, asphalt concrete pavement placement, traffic control and restoration.

East_Tigard_Sewer

East Tigard Sewer Improvements

City of Tigard Contract Amount $1,533,595 Installed 1200 lineal feet of new sanitary sewer line and manholes along and across a Fanno creek tributary for the City of Tigard.  Project involved treatment and removal of contaminated media treatment, bypass pumping, turbidity monitoring, wetland and vegetative plantings restoration