Charbonneau High Priority Utility Repair – City of Wilsonville
Contract Amount $921.783
Charbonneau HP Utility Repair – City of Wilsonville
All labor, equipment and materials for the open trench replacement of 2500 lineal feet of storm pipe, between 10″ and 18″ diameter, cure in place installation of approximately 1500 lineal feet of storm pipe between 12″ and 18″ diameter, replacement and restoration of storm drain appurtenance, such as manhole, catch basins, service laterals, etc., trench resurfacing, pipe and manhole abandonment and curb, sidewalk, driveway and landscape restoration.