Hazelwood Drive Sewer Replacement
City of Oregon City
Contract Amount $849,485
Upsize existing pipes using open trench and horizontal directional drilling (HDD) installation methods. The work will reroute the new sewer main out of sensitive backyards into the street right-of-way
Construction of approximately 1450 linear feet of 12-inch and 14-inch sewer main via open-cut and trenchless methods to replace and reroute an existing undersized gravity sanitary sewer main.
Replacement of approximately 10 sewer laterals. Construction of up to eleven (11) 48-inch manholes.