Tag Archives: asphalt

Pine-Meadows

Pine Meadows Paving

US Army Corps of Engineers – Portland District Contract Amount $794,612 Repair paving, cement treated base, resurface main road, archaeological site monitoring, trench for utilities, striping and wheel stops.

Rock_Creek_Trail

Rock Creek Trail Extension

City of Hillsboro Contract Amount $222,656 Job Summary: Remove existing path & curbs, install new stone entry, crosswalk improvements, sidewalk, apron, rock retaining wall, build new asphalt path.

Sherwood - Division Street

SE Division & SE Orcutt Storm Sewer & Pavement Rehab

City of Sherwood Contract Amount $587,963 This project consisted of installation of storm sewer 10″ and 6″ HDPE pipe, asphalt removal, cement treatment of base, manhole installation, stormwater management, erosion control, asphalt concrete pavement, installation of new concrete sidewalk and curb, traffic control and restoration.

Last_Road_Improvements

SE Last Road Street Public Improvements

Clackamas County Contract Amount $442,630 Braun Construction was hired by Clackamas County to provide the following services on SE Last Road Street: road improvements, grading, storm water improvements, new sidewalk, curb and gutter, irrigation, striping and new asphalt paving.

Corps_US_Moorings_Paving

US Moorings Warehouse Paving

US Army Corps of Engineers Contract Amount $76,999 Concrete pavement repair.  Asphalt paving.  Evacuation driveway and drain line repair.

Division_Orcutt_Sherwood

Sewer & Pavement Rehab – City of Sherwood

City of Sherwood Contract Amount $587.963 City of Sherwood – Division Street and Orcutt Place Storm Sewer and Pavement Rehab   Installation of storm sewer, asphalt removal, cement treating of base, asphalt concrete pavement placement, traffic control and restoration.

Hopkins_Kindergarten_Playground

Hopkins Elementary – Sherwood School District

Contract Amount $364,715     Recommendation – Bob Collins, P.M.P. Construction Manager for Sherwood School District “Braun Construction contracted with the Sherwood School District in the Summer of 2009 to build a new landscaped courtyard where only asphalt and old abandoned drain lines existed previously.  It was a challenging project with many unknown site issues …

Read more