NorthParkLot_ParkSvc Fort Vancouver National Historic site

Fort Vancouver National Historic Site

North Parking Lot Improvements -Federal project for the National Parks Department-Contract amount $1,436,196 Braun Construction completed this project constructing a new three tier pervious parking lot at the Fort Vancouver Historic Site, a part of the National Park system. The park is a culturally sensitive site and archeological monitoring was required for all excavation and …

Read more

Rock_Creek_Trail

Rock Creek Trail Extension

City of Hillsboro Contract Amount $222,656 Job Summary: Remove existing path & curbs, install new stone entry, crosswalk improvements, sidewalk, apron, rock retaining wall, build new asphalt path.

Sherwood - Division Street

SE Division & SE Orcutt Storm Sewer & Pavement Rehab

City of Sherwood Contract Amount $587,963 This project consisted of installation of storm sewer 10″ and 6″ HDPE pipe, asphalt removal, cement treatment of base, manhole installation, stormwater management, erosion control, asphalt concrete pavement, installation of new concrete sidewalk and curb, traffic control and restoration.

WES_Drainage_DiamondCourt

WES Drainage System – Clackamas County

Contract Amount $575,771 Diamond Court New stormwater pipe New stormwater treatment manhole Removal of downed trees and vegetation New maintenance access road William Otty Road Removal and replacement of an existing storm drain Add additional storm drain Removal and replacement of storm pipe and catch basin in William Otty Rd. Add maintenance access Sunny Way …

Read more

Last_Road_Improvements

SE Last Road Street Public Improvements

Clackamas County Contract Amount $442,630 Braun Construction was hired by Clackamas County to provide the following services on SE Last Road Street: road improvements, grading, storm water improvements, new sidewalk, curb and gutter, irrigation, striping and new asphalt paving.

Charbonneau_Utility_Repair

Charbonneau High Priority Utility Repair – City of Wilsonville

Contract Amount $921.783   Charbonneau HP Utility Repair – City of Wilsonville All labor, equipment and materials for the open trench replacement of 2500 lineal feet of storm pipe, between 10″ and 18″ diameter, cure in place installation of approximately 1500 lineal feet of storm pipe between 12″ and 18″ diameter, replacement and restoration of …