Daily Archives: November 7, 2018
Charbonneau High Priority Utility Repair – City of Wilsonville
Contract Amount $921.783 Charbonneau HP Utility Repair – City of Wilsonville All labor, equipment and materials for the open trench replacement of 2500 lineal feet of storm pipe, between 10″ and 18″ diameter, cure in place installation of approximately 1500 lineal feet of storm pipe between 12″ and 18″ diameter, replacement and restoration of …
Harney Street Water Quality Facility
City of Portland Contract Amount $34,116 Harney Street water quality project adjacent to Johnson Creek. This project constructed a water detention area that will collect runoff from surrounding neighborhoods, helping to clean the water and remove sediment before the water is discharged in to Johnson Creek, regrading Harney Street so that it sheds water away from …
2018 Chumbley and Cottonwood Wildlife Mitigation Sites
US Army Corps of Engineers – Portland District Contract Amount $504,789 Braun Construction was hired by the US Army Corps of Engineers to maintain existing riparian plantings at Chumbley (75 acres) and Cottonwood Island (100 acres) wildlife mitigation sites in Cowlitz County, WA. This consisted of: Mowing and weed whacking Herbicide application Manual removal of …
Dickinson Park Stream Enhancement
City of Portland Contract Amount $30,358 Braun Construction removed a pipe, pump house, footbridge, and other structures to restore 68 feet of stream to create wetland and floodplain habitat next to the stream channel. This will help to control flooding, recharge groundwater, trap sediments and pollution, recycle nutrients, and provide habitat. Summer flows from …