Daily Archives: August 22, 2019

Rock_Creek_Trail

Rock Creek Trail Extension

City of Hillsboro Contract Amount $222,656 Job Summary: Remove existing path & curbs, install new stone entry, crosswalk improvements, sidewalk, apron, rock retaining wall, build new asphalt path.

Hazelwood_Drive_Sewer

Hazelwood Drive Sewer Replacement

City of Oregon City Contract Amount $849,485 Upsize existing pipes using open trench and horizontal directional drilling (HDD) installation methods. The work will reroute the new sewer main out of sensitive backyards into the street right-of-way Construction of approximately 1450 linear feet of 12-inch and 14-inch sewer main via open-cut and trenchless methods to replace …

Read more

Chumbly_Cottonwood_2019

2019 Chumbley and Cottonwood Wildlife Mitigation

US Army Corps of Engineers Contract Amount $537,120 Braun Construction was hired by the US Army Corps of Engineers to maintain existing riparian plantings at Chumbley (75 acres) and Cottonwood Island (100 acres) wildlife mitigation sites in Cowlitz County, WA.  This consisted of: Mowing and weed whacking Herbicide application Manual removal of poison hemlock, yellow …

Read more

Sellwood_Bridge_Stream_Restore

Sellwood Bridge-Powers Marine Park Water & Stream Restoration

Multnomah County Contract Amount $244,000 Job Summary: Restore bank along the Willamette River – regrade slope, restore outfall, stream restoration of outfall, build footbridge over outfall with large rocks, construction of energy dissipation systems, build footpath along park, erosion control of slopes. Build weirs and stabilization of slopes. Stormwater management.

Bradford_Island_ArmyCOE

Bradford Island

US Army Corps of Engineers Contract Amount $56,737 The US Army Corps of Engineers needed cleaning and videoing storm drain lines from a service building adjacent to a hazardous waste storage area on Bradford Island. Braun Construction had to figure out a way to jet the lines with water and not let the contaminated sludge …

Read more

Sherwood - Division Street

SE Division & SE Orcutt Storm Sewer & Pavement Rehab

City of Sherwood Contract Amount $587,963 This project consisted of installation of storm sewer 10″ and 6″ HDPE pipe, asphalt removal, cement treatment of base, manhole installation, stormwater management, erosion control, asphalt concrete pavement, installation of new concrete sidewalk and curb, traffic control and restoration.